f.azh.kz
- 05 ماۋ. 2026 16:00
- 46
Atyrau Central Bridge Closure: Roadworks to Disrupt Traffic from June 6
Atyrau residents and commuters should prepare for significant traffic disruptions as the city's central bridge will be temporarily closed to vehicle traffic starting June 6. The closure is necessary to facilitate essential road repair work on Abay Street.
Planned Roadworks and Detours
The temporary halt in traffic is part of a planned medium repair of the road surface on Abay Street. In response to the roadworks، traffic police and city administration will be rerouting public transport. Details of the new routes will be published by the city authorities via a special diagram.
Impact on Commuters
City officials are urging residents and visitors to plan their travel routes in advance to avoid congestion. They also request understanding and patience regarding the temporary inconveniences caused by the repairs. The aim is to complete the work efficiently and restore normal traffic flow as soon as possible.
Restoration of Normal Traffic
Once the road repair work is completed، vehicle and public transport movement on the central bridge will be fully restored to its standard operational capacity.
This information was reported by the Infohub.kz news agency.
-
ناسيونالنىي بانك كازاحستانا پروگنوزيرۋەت پوستەپەننوە يزمەنەنيە ستاۆوك پو كرەديتام ي دەپوزيتام ۆ سۆيازي سو سنيجەنيەم بازوۆوي ستاۆكي ي ينفلياسيي.